WorldWide Drilling Resource

33 SEPTEMBER 2021 WorldWide Drilling Resource® YOUR AD COULD BE HERE AND SEEN BY THOUSANDS ALL YEAR! Nitrate Coated Premium Liners 5x6, 5x8, & 5x10 Gardner Denver 5-1/2x8 & 5-1/2x10 Gardner Denver 7-1/2x8 & 7-1/2x10 Gardner Denver Rods Heat-Treated & Chromed 5x6, 5x8, & 5-1/2x8 Gardner Denver 5x10 & 5-1/2x10 Gardner Denver 7-1/2x8 & 7-1/2x10 Gardner Denver New Pumps In Stock Gardner Denver 4x5 TEE Triplex. Gardner Denver 5-1/2x5 TEE Triplex Gardner Denver 4x5 or 4-1/2x5 Duplex Gardner Denver 5x6 Duplex Gardner Denver 5x6 Air Drive Duplex Gardner Denver 5x8 Duplex Gardner Denver 5-1/2x8 Duplex Gardner Denver 7-1/2x8 Duplex Gardner Denver 7-1/2x10 Duplex Gardner Denver 5-1/2x5 THE Triplex Gardner Denver 5x8 PAH Triplex Call for Prices. We Have a Variety of Brands of Mud Pump Parts and Power Units in Stock. Special or Obsolete Parts Made to Order. Cash for Surplus Mud Pumps. Rebuilt Mud Pumps 4-1/2x6 Gaso Duplex 4-1/2x6 Oilwell Duplex Gardner Denver 4-1/2x8 PA-8 Triplex Gardner Denver 5x6 Duplex Gardner Denver 5x10 Duplex Gaso 5x10 Duplex OVER 300 PUMPS IN STOCK Armstrong Machine Co. Inc. Pocahontas, IA 50574 USA 712-335-4131 ~ 24 Hours 7 Days a Week • Fax: 712-335-4565 800-831-4527 USA & Canada (8AM to 4PM Monday-Friday) armstrongmachine.com amci@armstrongmachine.com Hydraulic Grout Pumps 5”, 6”, & 7-1/2” Legacy Cleanup Mission Makes Significant Progress Adapted from Information by the U.S. Department of Energy and N3B Los Alamos National Laboratory (LANL), located in Los Alamos, New Mexico, was established in 1943 as Site Y of the Manhattan Project for a single purpose - to design and build an atomic bomb. It took just 20 months to detonate the world’s first atomic bomb 200 miles south of Los Alamos at the Trinity Site on the Alamogordo bombing range. As a result of past LANL operations, the Department of Energy’s Environmental Management Los Alamos Field Office (EM-LA) investigates hazardous chemical and radioactive materials contamination and remediates sites where such materials are found. This is known as the Legacy Cleanup mission. Cleanup locations are sites of former LANL buildings, hillsides, canyon bottoms, and old landfills. Mission activities include surface and groundwater monitoring and remediation, removing contaminated soil, as well as decontaminating and decommissioning surplus process-contaminated buildings. Over 2100 contaminated sites were originally identified for action, and 1100 have been closed, ranging from small spill sites with only several cubic feet of contaminated soil to large landfills encompassing several acres. Earlier this year, the EM-LA and N3B, the U.S. Department of Energy’s primary cleanup contractor, shipped hundreds of containers of purged well water and other materials from sites across LANL for off-site disposal. Since September of 2020, crews have shipped more than 211,000 gallons of purged well water and drilling fluids, as well as nearly 100 cubic yards of petroleum-contaminated soil and run-of-the-mill industrial materials linked to past LANL operations. Those materials included ENV Legacy continued on page 36

RkJQdWJsaXNoZXIy NDk4Mzk=